Capital WIP is referred to as Assets under Construction in SAP and are represented by a specific Asset class. Usually depreciation is not charged on Capital WIP.
All costs incurred on building a capital asset can be booked to an Internal Order and through the settlement procedure can be posted onto an Asset Under Construction. Subsequently on the actual readiness of the asset for commercial production, the Asset Under Construction gets capitalized to an actual asset.